Western Australia Route Review - Route Structure Proposal 2
As a result of work undertaken in Perth this week to determine a safe and acceptable SID/STAR package to support the proposed structure it has become clear that a revision to the south west corridor is required. The necessity for change stems from a combination of factors including runway 21 operations, the impact of restricted airspace to the immediate north, the number of route crossovers and profile altitude requirements for arrivals. The graphic accessed from the link below displays the revised route structure. Graphics of the SID/STAR package for various runway operations will be prepared and made available shortly. |
Last Updated: September 15, 2006
